Home/UT/Provo/Solar Install
Permit Required

Solar Install Permit Requirements — Provo, UT

Yes, Provo City requires a permit for solar panel installations. You must submit a solar PV system permit and a concurrent net metering permit to Provo City Power.

Jurisdiction data confirmed as of July 10, 2026

Get exact requirements for your address →

Free Permit Check. No account required.

What affects your permit requirement

System valuation (construction cost) directly determines permit fees using the 1997 UBC fee table.
Plan check fee of 65% of the building permit fee is charged in addition to the base permit fee.
Net metering permit must be submitted concurrently to Provo City Power alongside the building permit.
Compliance with the Solar PV System Checklist is required as part of the permit application.
Project-specific fee calculation requires contact with the Building Division for final determination.
Run a free search for your address →

Typical requirements

Fee basis
  • Building Permit (Solar PV System): Based on construction valuation using 1997 UBC fee table; typically $50 to several hundred dollars
  • Plan Check Fee: 65% of the building permit fee
Permit cost is based on system valuation and mainly covers inspection costs. A plan check fee is charged to cover plan review before permit issuance.
Department
Provo Building Division
(801) 852-6428
https://cvportal.provo.org/cityviewportal

These figures reflect typical jurisdiction data. Fees and timelines change. Run a free search on your exact address for jurisdiction-confirmed requirements before you bid or apply.

Frequently asked questions

01

Do I need a permit to install solar panels in Provo, Utah?

Yes, Provo City requires a permit for solar panel installations. You must submit both a solar PV system permit and a net metering permit to Provo City Power concurrently.

02

How much does a solar permit cost in Provo?

Permit fees are based on system valuation using the 1997 UBC fee table. Typical solar permits in Utah range from $50 to several hundred dollars, plus a plan check fee of 65% of the building permit fee. Contact (801) 852-6428 for a project-specific quote.

03

Where do I apply for a solar permit in Provo?

Apply online at https://cvportal.provo.org/cityviewportal by clicking 'Apply for a Building / Fire / Electrical Permit' to begin the application process.

04

What documents do I need for a solar permit in Provo?

You must follow the Solar PV System Checklist provided by Provo City. Submit your application through the City View Portal along with plans and documentation meeting the 2021 International Building Code requirements.

05

Who do I contact for solar permit questions in Provo?

Contact the Provo Building Division at (801) 852-6428 or visit provo.gov/200/Building. They can provide project-specific fee calculations and answer questions about the Solar PV System Checklist requirements.

Related permit guides

Know exactly what permits your job requires.

Free permit checks. No account required.

Research permits for your address →