Home/UT/Provo/Solar Install
Permit Required

Solar Install Permit Requirements — Provo, UT

Yes, Provo City requires a permit for solar panel installations. You must submit a Solar PV System Checklist and a concurrent net metering permit to Provo City Power.

Get exact requirements for your address →

3 free searches. No account required.

What affects your permit requirement

System valuation and construction cost determine the permit fee using the 1997 UBC fee assessment table.
Plan check fees equal 65% of the building permit fee and cover the cost of plan review before permit issuance.
Net metering permits must be submitted concurrently to Provo City Power in addition to the building permit.
Compliance with the Solar PV System Checklist is required for all solar installations in Provo.
Inspection costs are covered by the permit fee structure and are factored into the overall cost calculation.
Run a free search for your address →

Typical requirements

Fee range
$50–$500
Department
Provo Building Division
(801) 852-6428
https://cvportal.provo.org/cityviewportal

These figures reflect typical jurisdiction data. Fees and timelines change. Run a free search on your exact address for jurisdiction-confirmed requirements before you bid or apply.

Frequently asked questions

01

Do I need a permit for solar panels in Provo, Utah?

Yes, Provo City requires a building permit for all solar panel installations. You must complete a Solar PV System Checklist and submit a net metering permit concurrently to Provo City Power.

02

How much does a solar permit cost in Provo?

Solar permit fees in Provo typically range from $50 to several hundred dollars, based on your system's valuation and construction cost. A plan check fee of 65% of the building permit fee is also charged. Contact the Building Division at (801) 852-6428 for a project-specific fee calculation.

03

What documents do I need to submit for a solar permit in Provo?

You must submit a Solar PV System Checklist as part of your building permit application. Additionally, a net metering permit must be submitted concurrently to Provo City Power to comply with local requirements.

04

Where do I apply for a solar permit in Provo?

Apply online at https://cvportal.provo.org/cityviewportal by clicking 'Apply for a Building / Fire / Electrical Permit' to begin the permit application process. You can also contact the Building Division at (801) 852-6428 for assistance.

05

What building code does Provo use for solar installations?

Provo City follows the 2021 International Building Code for solar installations and uses the 1997 UBC fee assessment table to calculate permit costs based on system valuation.

Know exactly what permits your job requires.

3 free searches. No account required.

Research permits for your address →