Bathroom Remodel Permit Requirements — Eden Township, PA
No permit is required for this finish-work-only bathroom remodel in Eden Township, Pennsylvania. Cosmetic work such as tile, flooring, paint, and vanity replacement in place does not constitute a structural alteration under the PA UCC / IRC 2021.
Get exact requirements for your address →3 free searches. No account required.
What affects your permit requirement
Typical requirements
- Department
- Eden Township Zoning Office (Solanco Engineering)(717) 786-0355https://www.edentownship.org/zoning
These figures reflect typical jurisdiction data. Fees and timelines change. Run a free search on your exact address for jurisdiction-confirmed requirements before you bid or apply.
Frequently asked questions
Do I need a permit to retile my bathroom and replace the vanity in Eden Township?
No. Cosmetic finish work—tile, flooring, paint, and vanity replacement in place—does not require a permit in Eden Township as long as plumbing, electrical, and structural elements are not altered. If you move fixtures or add new circuits, you must contact the zoning office first.
What is Eden Township's permitting authority?
Eden Township Zoning Office, administered by Solanco Engineering, located at 103 Fite Way Suite C, Quarryville, PA 17566. Phone: (717) 786-0355. Website: www.edentownship.org/zoning.
What happens if I make a scope change during my bathroom remodel?
If you decide to move fixtures, add electrical circuits, install a new exhaust fan, or open walls, you must contact the zoning office at (717) 786-0355 before proceeding. Those additions constitute an alteration and require a permit.
What building code does Eden Township follow?
Pennsylvania UCC (Uniform Construction Code) adopted the 2021 I-Code series effective January 1, 2026. Permits applied for after that date are governed by the 2021 International Residential Code (IRC).
If a permit were required, how much would it cost?
The minimum zoning permit fee is $30.00. Alterations not meeting a defined structural classification are billed at 1% of construction cost, plus a 10% UCC code fee. Since this project does not require a permit, no fee applies.