Home/NJ/Flemington/Shed Install
Permit Required

Shed Install Permit Requirements — Flemington, NJ

Yes, two permits are required for this shed install in Raritan Township: a Zoning Permit (must be approved first) and a Construction Permit, because the shed exceeds 200 square feet and therefore does not qualify for the utility shed exemption.

Get exact requirements for your address →

3 free searches. No account required.

What affects your permit requirement

Shed footprint exceeds 200 square feet, triggering full permit requirement instead of exemption.
Shed must comply with 15-foot setback from all side and rear property lines due to size.
Shed cannot be placed in front yard; corner lots have two front yards.
Concrete pad for shed may trigger stormwater management requirements if impervious area exceeds 1,000 sq ft or disturbance exceeds 2,500 sq ft.
Zoning approval must be obtained and submitted with Construction Permit application before either permit is accepted.
Run a free search for your address →

Typical requirements

Fee basis
  • Construction Permit — Building Subcode (Shed, R-3/R-5 residential, with foundation): $100.00
  • State training fee (DCA surcharge): $0.00371 per cubic foot of volume
Zoning Permit application requires a non-refundable review fee; specific dollar amount not confirmed in publicly available document—contact Planning & Zoning Department at (908) 806-6100 to confirm before submitting.
[fee schedule]
Department
Raritan Township Construction Office
(908) 806-6114
https://www.raritantwpnj.gov/departments/construction

These figures reflect typical jurisdiction data. Fees and timelines change. Run a free search on your exact address for jurisdiction-confirmed requirements before you bid or apply.

Frequently asked questions

01

Do I need a permit for a shed in Raritan Township, NJ?

Yes. Any shed over 200 square feet or taller than 10 feet requires both a Zoning Permit and a Construction Permit. Sheds 200 sq ft or less and 10 feet or less in height with no utility connections are generally exempt.

02

How far back does my shed need to be from the property line?

If your shed is over 200 sq ft or over 10 feet tall, it must be set back at least 15 feet from all side and rear property lines. Sheds cannot be placed in a front yard.

03

Can I put a shed in my front yard in Raritan Township?

No. Sheds are not permitted in front yards. Corner lots have two front yards, so verify your property lines with a survey. The 15-foot setback applies to side and rear property lines only.

04

What does a shed permit cost in Raritan Township?

The Construction Permit for a shed with foundation is $100.00 flat fee. The Zoning Permit has a non-refundable review fee, but the specific amount is not posted online—contact the Planning & Zoning Department at (908) 806-6100 to confirm the current fee.

05

Do I need stormwater management for my shed?

If your concrete pad and shed project creates 1,000 or more square feet of new impervious area or disturbs more than 2,500 square feet of land, stormwater management measures are required. Confirm with the Construction Office at the time of application.

Know exactly what permits your job requires.

3 free searches. No account required.

Research permits for your address →